Switching VMD Datum Zero Location?

Discussion in 'CNC Cutting' started by J-Nol, Jun 30, 2019.

  1. J-Nol

    J-Nol New Member

    Joined:
    Oct 1, 2016
    Messages:
    4
    Likes Received:
    0
    Trophy Points:
    36
    I moved my table to a new shop and when I put it back together, the zero is at the bottom right of the table instead of the bottom left. Is there a way to change the zero setting in the VMD to have the machine datum in the bottom right? Or do I have to take the gantry apart and flip it (because I would rather not do that).
     
  2. Dnmeistr-LECS

    Dnmeistr-LECS Moderator Staff Member

    Joined:
    Dec 22, 2015
    Messages:
    672
    Likes Received:
    108
    Trophy Points:
    123
    You must of assembled the gantry 180 out from when you took it apart. Short from swapping two of the wires on the motor cable you will need to flip the gantry back around from where you had it originally.
     

Share This Page

  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.
    Dismiss Notice